|
Electrical Contracting & Building
Services > Project Areas:
Education |
|
|
|
All of our operatives are security
checked and we possess the
flexibility to ensure that projects
are completed during term breaks to
minimize disruption. Our experience
is extensive
and covers:
|
|
Our Education clients
include: |
|
Barrow Hill Primary School |
|
Grey Court School, Richmond |
|
Green Dragon Primary School |
|
Fullbrook School, Woking |
|
Hounslow Heath Nursery School |
|
Robinsfield Infant School, London |
|
Malmesbury School, Morden |
|
Beecholme Primary School |
|
Chipstead Valley Primary School |
|
Hampton Community College |
|
Longford Community School |
|
Syon Park School, Isleworth |
|
Cranford Community College |
|
Cranford Nursery & Junior School |
|
Andrew Ewing School, Hounslow |
|
|
|
|
• |
Refurbishment of the
electrical installations |
| |
•
|
Installation of
complete fire alarm systems |
| |
• |
Emergency lighting |
| |
•
|
Cabling & rewiring |
| |
•
|
Lighting and power systems |
| |
• |
Replacement of
electrical power distribution |
| |
• |
Replacement of light
fittings |
| |
• |
Replacement of
distribution boards |
| |
• |
and much more - see
examples on this page of our
extensive portfolio of clients. |
| |
|
|
|
|
|
Barrow Hill Primary School, City Of
Westminster
|
|
Working in conjunction with Ingleton
Wood consultants and responsible for
the installation of a complete fire
alarm system and amendments to the
emergency lighting. |
|
|
|
|
Grey Court School, Ham, Richmond,
Surrey
|
|
Working in conjunction with Atkins
Properties and Adrem Construction
and responsible for the
refurbishment of the electrical
installation in the CDT area |
|
|
|
|
Green Dragon Primary School,
Brentford, Middlesex
|
Working in conjunction with PWA
Consultants and responsible for the
installation of emergency lighting
and fire alarm systems.
|
|
|
|
|
Fullbrook School, New Haw Woking,
Surrey
|
|
Working in conjunction with Atkins
Ltd and Adrem Construction and
responsible for the refurbishment of
the electrical installation in the
first floor of the science block. |
|
|
|
|
Hounslow Heath Nursery School,
Hounslow, Middlesex
|
|
Working in conjunction with PWA
consultancy for the London Borough
of Hounslow with responsibility for
carrying out a full periodic test to
all circuits, replacement of light
fittings to various areas, warning
signage and replacement of
distribution boards. |
|
|
|
|
Robinsfield Infant School, London
|
Working in conjunction with Ingleton
Wood consultants and responsible for
alterations to the lighting and
power installation.
|
|
|
|
|
Malmesbury School, Morden, London
|
|
Working in conjunction with Atkins
Ltd for the London Borough Of Merton
and responsible for the replacement
of existing panel boards with new
sub main cables and rewiring of the
lighting and power installation of
the first floor area including all
new fittings. |
|
|
|
|
Beecholme Primary School, Mitcham,
Surrey
|
|
Working in conjunction with Atkins
Ltd for the London Borough of Merton
and responsible for the complete
rewiring of the school including all
new mains distribution equipment and
cables, light fittings and power
outlets. |
|
|
|
|
Chipstead Valley Primary School,
Coulsdon, Croydon, Surrey
|
Working in conjunction with PFB
Construction Management Systems
responsible for the installation of
fire alarm systems.
|
|
|
|
|
Hampton Community College, Hampton,
Middlesex
|
Working as main contractor
responsible for the refurbishment of
lighting and power.
|
|
|
|
|
Longford Community School, Feltham,
Middlesex
|
Carried out Periodic Inspection
Report and relevant works to comply
with BS 7671.2008 wiring
regulations.
|
|
|
|
|
Syon Park School, Isleworth,
Hounslow, Middlesex
|
Working with OWA Consultants
responsible for replacing the Fire
Alarm and Emergency Lighting
systems.
|
|
|
|
|
Cranford Community College,
Cranford, Hounslow, Middlesex
|
|
Carried out Period Inspection Report
and relevant works to comply with BS
7671.2008 wiring regulations.
Installed new sub mains for new air
conditioning and fresh air
installation to which O&C were the
main contractor on site. |
|
|
|
|
Cranford Nursery, Infant and Junior
School, Cranford, Middlesex
|
Working with PWA Consultants
responsible for replacing the Fire
Alarm and Emergency Lighting
systems.
|
|
|
|
|
Andrew Ewing School, Hounslow,
Middlesex
|
Working with PWA Consultants
responsible for the replacement of
the electrical power distribution.
|
|
|
|
|